Non-Compliance detail


  
Summary
 
Licence number: 2647
Annual Return Start: 01 Jan 2022
Annual Return End: 31 Dec 2022
Date Received: 24 Feb 2023
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
O6.3 Inflow to Toukley Sewage Treatment Plant bypassed secondary treatment at flow rates less than the 830 L/sec threshold specified in Condition O6.3 EPA action determined as part of scheduled inspection program 5
L4.1 Daily volume of water discharged was greater than the limit of 60,000 kL specified in Licence Condition L4.1 EPA action determined as part of scheduled inspection program 4
P1 Water was pumped from the Wyong South Wet Weather Pond to Ourimbah Creek, in contravention of the designated discharge points listed in Condition P1 EPA action determined as part of scheduled inspection program 4
M2.2 Monitoring of water quality parameters added to modified EPL was not undertaken at the frequency prescribed in Condition M2.2 EPA action determined as part of scheduled inspection program 3
L2.2 Calculated annual loads of total nitrogen, total suspended solids and zinc were greater than the load limits specified in Condition L2.2 EPA action determined as part of scheduled inspection program 1